South Point Biomass Generation Plant
South Point Biomass Generation Plant
ProposedBiomass / Wood Incinerator           
Address

100 Collins Road
South Point, OH
45680
United States of America
Latitude: 38.424264
Longitude: -82.5754819
Notes
200 MW biomass (200 MW nameplate @ 100% "Wood Waste"); renewable energy certification granted; 09-1043-EL-REN Biomass Group LLC initially proposed the 148-200MW South Point project in Lawrence County, Ohio - the largest project in the US - in the 4th quarter of 2003 with a then-anticipated start date of 1 April 2006. That start date was contingent on signing a power purchase agreement by 31 December 2003 - a goal that has yet to be met. The 7 proposed boilers already exist, but had been burning coal. The Turbine would be completely new. The existing facility assets also include raw water and waste water systems, extensive underground piping, covered fuel storage, rail, an extensive road system, and a 1980's baghouse and stack. The air pollution control requirements will be satisfied by the addition of a new precipitator, catalyst systems, and a dry scrubber. Thomas King, executive vice-president, finance at US Renewables Group, which buys, develops and operates renewable energy and clean fuel assets, estimates the daily requirements of such a plant to exceed 300 truckloads of fuel a day.
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.4%0.2%0.2%0.2%0.2%
Asian0.4%0.3%0.3%0.7%0.8%
Black4.6%2.4%2.2%3.3%3.1%
Hispanic1.6%1.1%1.4%1.6%1.3%
White89.1%92.0%91.9%89.9%90.5%
90.5%
Population1,12912k31k97k244k
Income$60k$51k$45k
Visualize demographics on Justice Map

GROUPS
GroupSt.Interest
Buckeye Forest Council Interested
Voices for the Forests Interested


CORPORATION
NameRelationOwnership
Biomass Group, LLC Owner 0%


Facility Search


View Area in a Larger Map

More nearby facilities
Generator #1
Unit Type: Burner: Boiler
Power 200 MW

Status History
Proposed10-15-2003



Fuels and Products
Wood Waste Solids 1#Input
Other Biomass Solid 2#Input
Paper / Lumber Mill Wood Wastes 3#Input
Agricultural Crop Residue 4#Input
Urban Wood Waste (Tree Trimmings) 5#Input
Forest Cuttings 6#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2010



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2010



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2010



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2003



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2010



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Boiler


Status History
Proposed2010



Fuels and Products
Wood Waste Solids 1#Input

Generator #1
Unit Type: Burner: Turbine


Status History
Proposed2010



Fuels and Products
Wood Waste Liquids 1#Input


Fewer Details