
2002.1 MW
4377 Heckscher Drive
Jacksonville, FL
32226
United States of America
Latitude: 30.4172
Longitude: -81.5525
Construct two new 297.5 MW CFB boilers as a repowering project to replace two existing boilers (Units 2 [partly fundedby DOE] and 1). Allowable fuels include coal and petroleum coke. :