Northside Generating Station
Northside Generating Station
Operating           Total Power
2002.1 MW
Address

4377 Heckscher Drive
Jacksonville, FL
32226
United States of America
Latitude: 30.4172
Longitude: -81.5525
Notes
Construct two new 297.5 MW CFB boilers as a repowering project to replace two existing boilers (Units 2 [partly fundedby DOE] and 1).  Allowable fuels include coal and petroleum coke. :
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.1%0.1%0.4%0.4%0.4%
Asian3.3%3.3%4.0%4.4%4.6%
Black18.4%18.4%27.0%36.2%26.2%
Hispanic9.6%9.6%10.6%11.4%10.8%
White62.1%62.1%53.0%43.0%53.5%
53.5%
Population1,5181,51835k296k1,141k
Income$89k$56k$58k
Visualize demographics on Justice Map

CORPORATION
NameRelationOwnership
JEA Owner 100%
Facility Search


View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuelSecondary Fuel(s)
298 MWOperatingPetroleum Coke Coal  
298 MWBurner: Fluidized Bed - CirculatingOperating   
298 MWBurner: Fluidized Bed - CirculatingOperating   
298 MWOperatingPetroleum Coke Coal  
62 MWBurner: TurbineOperatingOil   
564 MWOperatingNatural Gas Residual Fuel Oil Landfill Gas
62 MWBurner: TurbineOperatingOil   
62 MWBurner: TurbineOperatingOil   
62 MWBurner: TurbineOperatingOil   

More Details


COMMENTS
Log in to write a comment.