Lima Wastewater Treatment Plant
Lima Wastewater Treatment Plant
Operating           
Address

1200 Fort Amanda Rd
Lima, OH
45804
United States of America
Latitude: 40.7227236
Longitude: -84.1316003
Notes
First constructed in 1930, the Lima Wastewater Treatment Plant consisted of screening, grit removal, primary sedimentation, and anaerobic digestion. Throughout the years, secondary treatment, tertiary treatment and additional sludge digestion were added. In 1973, the plant was expanded to an average dry weather flow capacity of 18.5 million gallons per day (MGD) , and a peak flow capacity of 53.0 MGD. The design concept called for secondary and advanced treatment portions of the plant to operate at a peak rate of 33.0 MGD, with any remaining flow receiving primary settling and chlorination. Since 1973 the plant has provided primary, secondary and tertiary treatment, as well as biosolids recycling.
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.4%0.5%0.4%0.3%0.2%
Asian1.7%0.6%1.0%1.0%0.7%
Black3.0%24.7%20.6%15.8%7.8%
Hispanic3.1%4.1%3.8%3.4%2.7%
White86.0%63.2%67.3%73.5%84.1%
84.1%
Population1,13520k53k78k166k
Income$72k$51k$51k$56k
Visualize demographics on Justice Map

Facility Search


View Area in a Larger Map

More nearby facilities
Generator #1
Unit Type: Burner: Turbine
Power 0.09 MW

Status History
Operating2010



Fuels and Products
Digester Gas 1#Input
Contaminated Soil 1#Output
Sewage Sludge 2#Input


Fewer Details


COMMENTS