Northwest Florida Renewable Energy Center - Port St. Joe
Northwest Florida Renewable Energy Center - Port St. Joe
DefeatedBiomass / Wood Incinerator           
Address

521 Premier Drive
Port Saint Joe, FL
32456
United States of America
Latitude: 29.8372
Longitude: -85.300834
Notes
This plant faced local opposition in Tallahassee and forced BG&E to withdraw the air permit. However, in February 2011, the company reapplied for the permit in Port St Joe. In late November 2011, the company pulled out, because investors were unwilling to support the risky venture. In July 2011 the plant got its final air permit. A civil rights complaint was filed with the U.S. Environmental Protection Agency (EPA) charging the Florida Department of Environmental Protection with environmental racism in granting the facility its air permit. Woody Biomass, Yard Trash (<=5%) and/or Fuel Crops The project would have been a biomass integrated gasification combined cycle facility. It was to be a 47 MW net electric generating plant requiring 735 bone dry tons of woody biomass per day. It is sited in an industrial zone - formerly a coal distribution spot. Other background on what was proposed: The project consists of a biomass fuel “wood chips” delivery/ handling system, a biomass gasification system, a biomass dryer, a gas cleanup system, two gas combustion turbines, two heat recovery steam generators (HRSG) with duct burner firing, condensing steam turbine generator, an auxiliary natural gas fired package boiler for start-up use only, an emergency flare system, cooling towers, and auxiliary support equipment such as air systems. The plant will provide ~ 25 permanent jobs. BG&E also plans to have a 6,000 acre growing space to grow the biomass feedstock. The plant will produce 30-40 tons of ash/day which may be used as landfill cover etc.
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.5%1.1%0.7%0.5%0.5%
Asian0.3%1.1%0.7%0.6%0.6%
Black35.4%35.0%20.7%13.1%11.7%
Hispanic2.3%6.2%4.4%3.8%4.7%
White57.5%51.6%68.9%77.6%78.0%
78.0%
Population6421,4783,7976,23216k
Income$52k$50k$50k$50k
Visualize demographics on Justice Map



CORPORATION
NameRelationOwnership
Biomass Gas & Electric Developer 0%
Rentech Inc. Developer 0%




RESOURCE
Resource
Outreach flier for public forum 4/13/2011
Facility Search


View Area in a Larger Map

More nearby facilities
Unit #1
Unit Type: Burner: Gasification
Power 23 MW

Status History
Defeated11-30-2011
Proposed2-2011



Fuels and Products
Forest Cuttings465 Tons Per Day1#Input

Unit #2
Unit Type: Burner: Gasification
Power 23 MW

Status History
Defeated11-30-2012
Proposed2-2011



Fuels and Products
Forest Cuttings465 Tons Per Day1#Input


Fewer Details