Oak Grove
Oak Grove
OperatingCoal Power Plant           Total Power
1795.4 MW
Address

Bremond, TX
United States of America
Latitude: 31.1781463623047
Longitude: -96.4874267578125
Notes
This facility could move Austin into a non-attainment zone. In November 2008, Oak Grove Management Company LLC agreed to install Maximum Acheivable Control Technology (MACT). TXU orginally planned to build 11 new coal plants, but since 2007 TXU agreed to drop 8 of their 11 proposed plants. Oak Grove is one of the remaining plants TXU plans to own and operate. As of October 2009, unit 1 was scheduled to be complete by the end of the year (2009) and unit 2's projected completion date is mid-2010.
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.2%0.1%0.1%0.4%
Asian0.9%2.4%2.4%0.8%
Black10.6%0.8%0.8%8.8%
Hispanic8.0%7.1%7.1%12.2%
White76.4%87.9%87.9%74.7%
74.7%
Population8471,2811,28119k
Income$45k$53k
Visualize demographics on Justice Map



CORPORATION
NameRelationOwnership
TXU Generation Company Owner 0%
Fluor Developer 0%


Facility Search


View Area in a Larger Map

More nearby facilities
Unit #1
Power 917 MW

Status History
Operating4-2010



Fuels and Products
Lignite Coal 1#Input
Natural Gas 2#Input

Unit #2
Power 879 MW

Status History
Operating4-2011



Fuels and Products
Lignite Coal 1#Input
Natural Gas 2#Input

Generator #1
Power 801 MW

Status History
Withdrawn12-31-2014
Withdrawn12-31-2012
Operating2009
Proposed2006



Fuels and Products
Lignite Coal 1#Input
Natural Gas 2#Input

Generator #1
Power 801 MW

Status History
Withdrawn12-31-2014
Withdrawn12-31-2012
Proposed2006



Fuels and Products
Lignite Coal 1#Input
Natural Gas 2#Input


Fewer Details


COMMENTS
Log in to write a comment.