Rt 360
Perry, FL
United States of America
Latitude: 30.080645
Longitude: -83.474866
power consortium: Disney World/Reedy Creek, JEA (Just Emphysema and Asthma), FMPA - FL's MORE Pollution Associates, the city of Tallahassee Utilities and their political/developer-friends (Buckeye)
"Taylor Energy Center will be a 765 MW (net) supercritical coal unit that will be developed on a site consisting of approximately 3,000 acres to be located approximately 5 miles southeast of Perry, in Taylor County, Florida. The land is bordered by Highway 27 on the north and the Fenholloway River on the west. Taylor Energy Center will include one coal fired boiler, one steam turbine generator with efficient steam cycle, a cooling system, water and wastewater treatment systems, material handling systems, air quality control systems, electrical interconnections, and other balance-of-plant systems. TEC will burn a blend of petcoke and coal, with the ability to burn coal sourced from various regions including Latin America, the Powder River Basin (PRB), and the Central Appalachia region."