Intermountain Power Project
Intermountain Power Project
ExpandingNatural Gas Power Plant           Total Power
1640 MW
Address

850 Brush Wellman Rd.
Delta, UT
84624
United States of America
Latitude: 39.509731
Longitude: -112.58018
Notes
to be converted to natural gas by 2025 2004 uprated Though withdrawn in 2007, this Unit 3 is was re-proposed before finally being defeated in July of 2009. It marked the Sierra Club's 100th victory is stopping coal fired power plants. A third unit is proposed beside the two existing power plants (pulverized coal fired) with fabric filter baghouse, low Nox burners and SCR, forced oxidation wet limestone FGD system, and combustion controls (CO & VOC). : BACT Limits Proposed (lb/MMBtu): PM10 (0.015 3-hr rolling ave), SO2 (0.10 30-day rolling ave), Nox (0.07 30-day rolling), CO (0.154 no ave), VOC (0.0027 no ave), lead (0.00002 no ave), HF (0.001 no ave), SAM (0.027 no ave).
Edits
Take Action
Data Sources

Facebook Icon     Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.2%0.7%
Asian0.2%0.5%
Black0.1%
Hispanic1.3%14.8%
White96.2%82.2%
82.2%
Population1,4346,150
Income$60k$68k
Visualize demographics on Justice Map

CORPORATION
NameRelationOwnership
Intermountain Power Agency Owner 100%


Facility Search


View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuelSecondary Fuel(s)
820 MWBurner: BoilerOperatingCoal Subbituminous Coal
820 MWBurner: BoilerOperatingCoal Subbituminous Coal
1200 MWBurner: Internal Combustion Engine - Combined CycleProposedNatural Gas  
950 MWBurner: Fluidized Bed - CirculatingDefeatedCoal  

More Details